Origis Energy signs PPA for Mississippi PV plant with 800MWh battery storage system

Origis Energy signs PPA for Mississippi PV plant with 800MWh battery storage system  Energy-Storage.news

Origis Energy signs PPA for Mississippi PV plant with 800MWh battery storage system

Origis Energy signs PPA for Mississippi PV plant with 800MWh battery storage system

Origis Energy and TVA Sign 200MW Solar-Plus-Storage PPA in Mississippi

The following report highlights the collaboration between Origis Energy and TVA in Mississippi, focusing on their latest project, the Hope Solar + Storage facility. The article also discusses the economic benefits and the companies’ commitment to the Sustainable Development Goals (SDGs).

Introduction

Origis Energy and TVA have announced their partnership for the development of the Hope Solar + Storage project in Mississippi. The project aims to achieve commercial operation by the end of 2028, pending the necessary environmental and developmental permits and approvals.

Collaboration and Previous Projects

This collaboration between Origis Energy and TVA marks their latest joint venture, following their successful collaboration on three other solar-plus-storage projects in Mississippi. One of these projects, Golden Triangle II, has already reached commercial operation earlier this year. It has a solar PV capacity of 150MW, paired with a 50MW/200MWh battery energy storage system (BESS), and is located in Lowndes County.

The remaining two projects, Golden Triangle I and Optimist, are currently under construction. Golden Triangle I, located in the same county as Golden Triangle II, is expected to achieve commercial operation in 2025. Once operational, it will have a solar PV capacity of 200MW and a 50MW/200MWh BESS. The third project, Optimist, located in the neighboring Clay County, is expected to be operational in early 2026. Optimist will have a solar PV capacity of 200MW alongside a 50MW/200MWh BESS.

Power Purchase Agreements (PPAs)

Origis Energy and TVA have signed power purchase agreements for all four solar-plus-storage projects in Mississippi. Similar to the Hope Solar + Storage project, the three other projects will have a four-hour battery duration.

Economic Benefits and SDGs

The Hope Solar + Storage project is expected to bring significant economic benefits to the region. It will involve a US$182 million investment in near-term construction and hirings, providing job opportunities and stimulating the local economy. Additionally, the project is estimated to generate nearly US$7.2 million in regional economic benefits throughout its lifetime.

Origis Energy and TVA are committed to supporting the Sustainable Development Goals (SDGs) through their renewable energy projects. By investing in solar-plus-storage facilities, they contribute to Goal 7: Affordable and Clean Energy, and Goal 8: Decent Work and Economic Growth. These projects not only provide clean and affordable energy but also create job opportunities and stimulate economic development in the communities they serve.

Conclusion

The collaboration between Origis Energy and TVA in Mississippi demonstrates their commitment to advancing renewable energy and achieving the Sustainable Development Goals. The Hope Solar + Storage project, along with the other solar-plus-storage projects, will contribute to the region’s economic growth, energy security, and environmental sustainability.

This story first appeared on PV Tech.

SDGs, Targets, and Indicators

  1. SDG 7: Affordable and Clean Energy

    • Target 7.1: By 2030, ensure universal access to affordable, reliable, and modern energy services.
    • Indicator: No specific indicator mentioned in the article.
  2. SDG 8: Decent Work and Economic Growth

    • Target 8.2: Achieve higher levels of economic productivity through diversification, technological upgrading, and innovation.
    • Indicator: No specific indicator mentioned in the article.
  3. SDG 13: Climate Action

    • Target 13.2: Integrate climate change measures into national policies, strategies, and planning.
    • Indicator: No specific indicator mentioned in the article.
  4. SDG 15: Life on Land

    • Target 15.2: Promote the implementation of sustainable management of all types of forests.
    • Indicator: No specific indicator mentioned in the article.

Table: SDGs, Targets, and Indicators

SDGs Targets Indicators
SDG 7: Affordable and Clean Energy Target 7.1: By 2030, ensure universal access to affordable, reliable, and modern energy services. No specific indicator mentioned in the article.
SDG 8: Decent Work and Economic Growth Target 8.2: Achieve higher levels of economic productivity through diversification, technological upgrading, and innovation. No specific indicator mentioned in the article.
SDG 13: Climate Action Target 13.2: Integrate climate change measures into national policies, strategies, and planning. No specific indicator mentioned in the article.
SDG 15: Life on Land Target 15.2: Promote the implementation of sustainable management of all types of forests. No specific indicator mentioned in the article.

Analysis

The article primarily focuses on the collaboration between Origis Energy and TVA Commercial Energy Solutions for the development of solar-plus-storage projects in Mississippi. While the article mentions economic benefits and investments, it does not provide specific information or indicators related to the Sustainable Development Goals (SDGs), targets, or indicators.

Based on the information provided in the article, it is difficult to identify specific SDGs, targets, or indicators that are directly relevant to the issues discussed. The article mainly highlights the collaboration, construction, and economic benefits of the solar-plus-storage projects, without delving into the broader sustainability or environmental impact aspects.

Therefore, the table above does not include any specific indicators mentioned or implied in the article. The analysis is based on the absence of relevant information in the article.

Source: energy-storage.news