US Data Center Construction Industry Report 2025: Market to Grow Rapidly Through 2030, Driven by Cloud Expansion, Digital Transformation, and Demand for Scalable, Energy-Efficient Infrastructure – GlobeNewswire
Report on the United States Data Center Construction Market and Alignment with Sustainable Development Goals (SDGs)
Executive Summary
The United States Data Center Construction Market is projected for significant growth, driven by digital transformation, technological advancements, and a critical focus on sustainable infrastructure. This expansion directly aligns with several United Nations Sustainable Development Goals (SDGs), particularly in the areas of industry and innovation (SDG 9), clean energy (SDG 7), and economic growth (SDG 8). The industry is increasingly adopting green building standards and renewable energy sources, reflecting a commitment to sustainable development alongside technological progress.
Market Projections: 2024-2033
- Estimated Market Value (2024): US$ 17.01 Billion
- Forecasted Market Value (2033): US$ 28.95 Billion
- Compound Annual Growth Rate (CAGR): 6.09% (2025-2033)
Key Market Drivers and Contribution to Sustainable Development Goals
Digital Transformation and Cloud Dependency
- Exponential growth in data generation, driven by increasing cloud dependency and remote work, necessitates the expansion of resilient digital infrastructure.
- The construction of scalable, high-capacity data centers supports the global digital economy and enhances connectivity.
- SDG Alignment: This trend directly supports SDG 9 (Industry, Innovation, and Infrastructure) by building resilient infrastructure that promotes inclusive and sustainable industrialization and fosters innovation.
Technological Advancements in AI, IoT, and 5G
- The proliferation of Artificial Intelligence (AI), the Internet of Things (IoT), and 5G technology demands high-performance data centers with low latency and advanced computational capabilities.
- Significant investments, such as the proposed $100 billion AI infrastructure venture by OpenAI, SoftBank, and Oracle, are accelerating the development of next-generation facilities.
- SDG Alignment: These developments advance SDG 9 by upgrading technological capabilities across industries. Large-scale projects also contribute to SDG 8 (Decent Work and Economic Growth) through significant job creation.
Focus on Sustainability and Energy Efficiency
- There is a pronounced industry shift towards sustainable and energy-efficient data center construction, driven by environmental regulations and corporate responsibility.
- Key practices include the integration of renewable energy sources, the implementation of innovative cooling systems, and adherence to green building standards to reduce carbon footprints.
- SDG Alignment: This focus is central to achieving SDG 7 (Affordable and Clean Energy) by increasing the share of renewable energy and improving energy efficiency. It also contributes to SDG 11 (Sustainable Cities and Communities) and SDG 12 (Responsible Consumption and Production) by promoting sustainable infrastructure and resource management.
Industry Challenges
High Capital Investment and Operational Costs
- The construction of modern data centers requires substantial upfront capital for land acquisition, materials, and sophisticated electrical and cooling infrastructure.
- Ongoing operational costs for energy, maintenance, and staffing present a continuous financial challenge, particularly for smaller market entrants.
Regulatory and Compliance Complexities
- The market is subject to a complex web of federal and state regulations governing land use, environmental impact, energy efficiency, and data security.
- Navigating these compliance standards, including obtaining necessary permits and adhering to zoning laws, can introduce delays and increase project costs.
Recent Industry Developments
- June 2025: Sika introduced sustainable solutions for data center construction, aiming to enhance efficiency and cooling in response to growing global investment.
- June 2025: Amazon announced a USD 10 billion expansion of its data center campus in North Carolina to bolster cloud and AI capabilities.
- March 2025: Related Companies launched a new data center development business, Related Digital, to deliver gigawatts of capacity across the U.S. and Canada.
- January 2025: EDGNEX Data Centers by DAMAC announced a USD 20 billion U.S. expansion plan targeting 2,000MW of capacity to support hyperscalers and AI growth.
- January 2025: A joint venture involving OpenAI, SoftBank, and Oracle was formed to invest $100 billion in AI infrastructure, including the construction of multiple large-scale data centers.
Market Segmentation Overview
By Tier Type
- Tier 1
- Tier 2
- Tier 3
- Tier 4
By Infrastructure
- IT Infrastructure
- PD & Cooling Infrastructure
- Miscellaneous Infrastructure
By Vertical
- IT & Telecom
- BFSI
- Healthcare
- Government & Defense
- Energy
- Others
By Key States
- California
- Texas
- Virginia
- New York
- Florida
- Illinois
Analysis of Sustainable Development Goals in the Article
1. Which SDGs are addressed or connected to the issues highlighted in the article?
- SDG 7: Affordable and Clean Energy – The article emphasizes the push for energy efficiency, innovative cooling systems, and the incorporation of renewable energy sources in data center construction.
- SDG 8: Decent Work and Economic Growth – The report details significant market growth, massive capital investments, and the creation of thousands of jobs, contributing to economic development.
- SDG 9: Industry, Innovation, and Infrastructure – The core subject of the article is the construction and upgrading of digital infrastructure, driven by technological innovation like AI, IoT, and 5G.
- SDG 11: Sustainable Cities and Communities – The focus on “green building requirements” and sustainable construction practices contributes to creating more sustainable infrastructure within communities.
- SDG 12: Responsible Consumption and Production – The article highlights the industry’s move towards sustainability, reducing carbon footprints, and using resources more efficiently through green practices.
2. What specific targets under those SDGs can be identified based on the article’s content?
-
SDG 7: Affordable and Clean Energy
- Target 7.2: By 2030, increase substantially the share of renewable energy in the global energy mix. The article mentions that operators are “incorporating… renewable energy sources into construction projects.”
- Target 7.3: By 2030, double the global rate of improvement in energy efficiency. This is supported by the focus on “energy efficiency,” “innovative cooling systems,” and “energy-efficient building techniques.”
-
SDG 8: Decent Work and Economic Growth
- Target 8.1: Sustain per capita economic growth in accordance with national circumstances. The article projects the market to grow from US$ 17.01 billion in 2024 to US$ 28.95 billion by 2033, with a CAGR of 6.09%.
- Target 8.2: Achieve higher levels of economic productivity through diversification, technological upgrading and innovation. The growth is driven by investments in cutting-edge technologies like AI, machine learning, and IoT.
- Target 8.5: By 2030, achieve full and productive employment and decent work for all. The article cites specific job creation initiatives, such as the Stargate project aiming to create “100,000 jobs” and Amazon’s expansion generating “500 high-skilled jobs.”
-
SDG 9: Industry, Innovation, and Infrastructure
- Target 9.1: Develop quality, reliable, sustainable and resilient infrastructure. The entire article focuses on the construction of “state-of-the-art,” “scalable, effective, and secure data center infrastructure.”
- Target 9.4: By 2030, upgrade infrastructure and retrofit industries to make them sustainable, with increased resource-use efficiency and greater adoption of clean and environmentally sound technologies and industrial processes. This is directly addressed by the mention of “green building requirements” and the industry’s collective push for “sustainable, energy-efficient data centers.”
- Target 9.c: Significantly increase access to information and communications technology. The expansion of data center capacity is a direct response to the “exponential growth in data generation” and the need to support technologies like 5G, cloud computing, and IoT.
-
SDG 11: Sustainable Cities and Communities
- Target 11.6: By 2030, reduce the adverse per capita environmental impact of cities. The adoption of “green building requirements” and sustainable construction practices helps mitigate the environmental impact of this large-scale infrastructure development.
-
SDG 12: Responsible Consumption and Production
- Target 12.2: By 2030, achieve the sustainable management and efficient use of natural resources. The focus on “energy efficiency” and reducing “carbon footprints” reflects a move towards more sustainable operational patterns in a resource-intensive industry.
3. Are there any indicators mentioned or implied in the article that can be used to measure progress towards the identified targets?
-
For SDG 7 (Affordable and Clean Energy)
- Implied Indicator: The rate of adoption of renewable energy sources and advanced cooling systems in new data center projects. The article states operators are “incorporating green building requirements, innovative cooling systems, and renewable energy sources.”
-
For SDG 8 (Decent Work and Economic Growth)
- Direct Indicator: Market value growth, forecasted to increase from US$ 17.01 billion in 2024 to US$ 28.95 billion by 2033.
- Direct Indicator: Compound Annual Growth Rate (CAGR) of 6.09%.
- Direct Indicator: Total capital investment amounts, such as the “$100 billion” investment by the OpenAI, SoftBank, and Oracle joint venture, and Amazon’s “$10 billion” expansion.
- Direct Indicator: Number of jobs created, specifically the “100,000 jobs” from the Stargate project and “500 high-skilled jobs” from Amazon’s expansion.
-
For SDG 9 (Industry, Innovation, and Infrastructure)
- Direct Indicator: Financial investment in infrastructure, including the “$100 billion” AI infrastructure plan and EDGNEX’s “$20 billion” U.S. expansion.
- Direct Indicator: The number and scale of new infrastructure projects, such as the “Ten enormous data centers” in the Stargate project and Amazon’s campus of “20 buildings.”
- Implied Indicator: Increased data processing and storage capacity, evidenced by the need to handle the “100.1 trillion megabytes of data” sent over U.S. wireless networks in 2023, an 89% increase since 2021.
-
For SDG 11 & 12 (Sustainable Cities/Responsible Consumption)
- Implied Indicator: The prevalence of sustainable design and construction practices, measured by the number of new data centers adhering to “green building requirements.”
- Implied Indicator: Reduction in carbon footprints of data center operations, which is mentioned as a “key area of concentration” for the market.
4. SDGs, Targets, and Indicators Table
| SDGs | Targets | Indicators |
|---|---|---|
| SDG 7: Affordable and Clean Energy |
7.2: Increase the share of renewable energy.
7.3: Double the rate of improvement in energy efficiency. |
– Incorporation of renewable energy sources in construction projects. – Adoption of innovative cooling systems and energy-efficient building techniques. |
| SDG 8: Decent Work and Economic Growth |
8.1: Sustain per capita economic growth.
8.2: Achieve higher levels of economic productivity through technological upgrading. 8.5: Achieve full and productive employment. |
– Market growth from US$ 17.01 billion to US$ 28.95 billion by 2033 (CAGR of 6.09%). – Investment amounts (e.g., $100 billion for AI infrastructure). – Number of jobs created (e.g., 100,000 jobs from the Stargate project, 500 high-skilled jobs from Amazon). |
| SDG 9: Industry, Innovation, and Infrastructure |
9.1: Develop quality, reliable, sustainable and resilient infrastructure.
9.4: Upgrade infrastructure to make them sustainable. 9.c: Increase access to information and communications technology. |
– Number of new data centers constructed (e.g., “Ten enormous data centers,” “20 buildings”). – Adoption of “green building requirements” in new projects. – Growth in data handling capacity to support the 89% increase in wireless data traffic. |
| SDG 11: Sustainable Cities and Communities | 11.6: Reduce the adverse per capita environmental impact of cities. | – Implementation of green building standards in data center construction. |
| SDG 12: Responsible Consumption and Production | 12.2: Achieve the sustainable management and efficient use of natural resources. | – Increased focus on reducing “carbon footprints” through energy-efficient designs. |